recent projects
Princes Highway Corridor Upgrade – Package 1 (PCU1):
A civil road construction project consisting of:
- Site 1 - Overtaking Lane, Northbound 1.66km and Southbound 1.64km – Meningie, SA – Bitumen Sealing.
- Site 2 - Overtaking Lane, Southbound 2km and Northbound 1.55km – Hatherleigh, SA – Bitumen Sealing.
- Site 3 – Furner Road Intersection Upgrade, Hatherleigh, SA – Bulk Earthworks, Full depth pavement construction, Asphalt.
- Site 4 – Walkers Tin Hut Road Intersection – Millicent, SA – Bulk Earthworks, RCBC & RCP, Full depth pavement construction, Asphalt.
- Site 5 - Westbound & Eastbound Overtaking Lane Extension MM320.8 to MM319.5 and MM318.7 to MM320.0 – Bulk Earthworks, RCBC, Full depth pavement construction, Bitumen Sealing
Princes Highway Corridor Upgrade – Package 2 (PCU2):
A civil road construction project consisting of:
- Site 1 – Upgrade of Rest Area – Tantanoola, SA – Bulk Earthworks, RCBC & RCP, Full depth pavement construction, Bitumen Sealing.
- Site 6 – Springs Road and Burrungule Road Intersection, Burrungule, SA – Full depth pavement construction, Asphalt.
- Site 7 – Upgrade of Various Roundabouts and Roadworks – Mount Gambier, SA – Bulk Earthworks, Full depth pavement construction, Asphalt, Kerbing and Annulus Concrete.
- Site 8 – Overtaking Lane - Glenburnie/Rennick, SA - Early Bulk Earthworks with Scraper and Haul Truck.
Caroline Landfill - Construction of Cell 4A - Civil and Associated Works:
A bulk earthworks project consisting of:
- Bulk Excavation to form Cell 4A, Bulk Fill Earthworks – place, grade, moisture condition and compact site won material
- Construction of interim stormwater diversion bund, informal stormwater drains, expose existing clay liners of Cells 2 & 3C for key ins, construct leachate drainage protection layer at Cell 4A temporary bund
- Subgrade preparation – rip, scarify and recompact the top 150mm of the subgrade in Cell 4A, proof roll and testing
- Supply and install clay liner and bunds – virgin clay supplied
- Leachate collection system – Supply and install HDPE, GCL and Cushion Geotextile Liners, Leachate Collection Sump, Airlift sump pump, HDPE leachate pipework, leachate collection aggregate and separation/filter geotextile.
Wulanda Recreation & Convention Centre – Demolition, Civil and Site Works:
A civil construction project consisting of:
- Complete demolition, removal and clean-up of site including tree removal and grubbing of stumps, garden beds, fencing & gates, asphalt paving & substrate, existing pools and buildings, footings, concrete.
- Careful dismantling and removal of playground equipment, boiler, auger and PV solar equipment and handover to principal.
- Partial demolition and clean-up of existing 50m pool ready for refurbishment.
- Temporary works – temporary site drainage, sediment control & bunding, temporary fencing/hording, temporary hardstands and roads.
- Excavation works – topsoil stripping, cut/fill earthworks, removal of fill from site, importation and compaction of engineered fill.
- Detailed excavation and backfill – construct batters adjacent to pools, back fill to all batters after retaining & pool walls constructed and tanked, detailed excavation and batters for lift pad footing.
- Stormwater – subsoil drainage behind retaining walls, surveying & validation of existing stormwater system, trench excavation, supply and install all pipes, pits, grates, atlantis flow tank, spel tank, head ends and scour protection.
- Pavements – Concrete Footpaths, Resheet existing asphalt, new construction of various asphalt and concrete vehicular pavements, water tank hardstand.
- Supply and installation of removable bollards, concrete footings for light poles, road and traffic signage, linemarking, wheel stops for carparks.
Meadows Stages 5,6,7&8:
A subdivision project consisting of:
- Bulk earthworks (strip topsoil, cut/fill, spread topsoil).
- Excavate and install common trenching, sewer, watermain, stormwater.
- Kerbing and pavement construction (crushed rubble subbase, crushed rock, base, Asphalt).
Braybrook Estate Stage 1:
A sub division project consisting of:
- Earthworks including stripping of topsoil, bulk cut for road pavement, spread topsoil.
- Excavation and installation of retention basin, swale drain, watermain, stormwater, property crossings, SAPN trench (excavate & backfill only).
- Installation of pits/headwall, kerbing.
- Construction of road pavements (crushed rubble subbase, crushed rock, base, AC10 Asphalt).
- Application of 2 coat bitumen seal to property crossings.
- Supply and install ballast to retention basin.
Tenison Woods College Junior School – Siteworks including demolition:
A civil construction project consisting of:
- Earthworks including stripping of topsoil, cut/fill onsite, spread topsoil.
- Construction and removal of temporary access roads.
- Demolition works including existing fencing, removal of existing trees, basketball court & existing paving.
- Detailed excavation works for footings.
- Construction of various pavements, kerbing works, bench out for retaining walls.
- Install supplied basketball ring posts, removable netball posts, and removable lockable bollards.
UniSA Yarning Circle:
A civil construction project consisting of:
- Excavated, prepared, supplied and installed 20mm crushed rock and brick paving on sand.
- Supplied and installed weed matting to mulch bed areas, shaped mulch areas, supplied and installed mulch.
- Excavated, shaped and scarified the Dry River Bed. Supplied and installed local bluestone cobbles to cover river bed.
- Supplied and installed E2 steel edging and timber edging to rubble paths.
- Supply and install Bluestone shards for seating, composite timber slats and back rests for seating, fire pit, stone shard causeway across river bed.
- Install Dreaming Story signs.
- Supply and install concrete sleeper steps, boulders with ground shaped around them, pram ramps, micro-sprinkler irrigation system, reconciliation stone.
Discover the success of our recent projects in Mount Gambier.
For your construction, earthmoving, and quarrying needs, contact us at 08 8725 4093.