Gambier Earth Movers Pty Ltd - Recent Projects
> Mount Gambier Saleyards Wastewater Treatment Upgrade
Major components of this project consisted of:- Excavation and subsequent construction of a 7.25ML Anaerobic and 7.0ML Contingency HDPE lined lagoons.
- The construction of a 3-bay 25m x 10m concrete-lined sedimentation basin.
- Installation of all accompanying pumps, pump stations, pressure main, gravity main and stormwater pipework.
- Installation of all electrical infeeds and switchboards.
- The construction of new site access and egress roads.
- Installation of new chain mesh security fencing, rural fencing and required shedding.
> Demolition of Old RSL Building, 1 Bay Road, Mount Gambier
Major components of this project consisted of:
- Demolition of the Old RSL Building, a two-storey building located at on the corner of Commercial Street and Bay Road, Mount Gambier.
- Included the removal of all demolition waste and footings to an EPA approved facility.
- Liaising with local council and contractors was conducted before the demolition to recycle as much of the buildings structure, linings and fixtures as possible.
> Lake Bonney Windfarm - Stage 2a
Major components of this project consisted of:
- Detailed excavation of 13 octagonal wind turbine towers 390m2 x 2m deep.
- Excavation and construction of 13 crane hardstands adjacent to wind tower excavations.
- Construction of tower access roads with accompanying swales, culverts, check dams, ballast spillways, fencing and gates.
- Existing road widening, re-surfing and maintenance.
> Millicent Heavy Vehicle Detour
Major components of this project consisted of:
- Bulk earthworks.
- 11.323kms of road construction.
- Stormwater construction.
- Major intersection construction to DTEI standard.
> Conroe Heights Subdivision - Stages 31, 32, and 33
Major components of this project consisted of:
- Bulk earthworks.
- Sewer and water construction.
- Stormwater construction.
- Road construction.
- Urban subdivision construction.
> Attamurra Fairways Estate
Major components of this project consisted of:
- Bulk earthworks.
- This project is currently under construction.
> Finger Point WWTP - No. 2 & No. 4 Sludge Basin's Underdrain Upgrades
Major components of this project consisted of:
- Bulk and detailed excavation of each lagoon's base and reinstatement.
- Collection pipework installation.
- Pump Sump installation.
- Installation of laser leveled filter sand.
- Spillway and embankment modification.
- Further, new reclaimed water, pumping main and electrical infrastructure installed to service new pump stations for each sludge lagoon (119.9k).
> Millicent WWTP Dried Sludge Platform Construction
Major components of this project consisted of:
- Sludge platform base bulk earthworks and preparation.
- Rubble platform construction.
- Installation of all collection pipework, pump sump and pumping main pipework.
- Construction of cement stabilized crushed rock (CSCR) platform wearing course with enveloped levels.